If you are installing with adhesive, a leveling compound should be used to repair the floor before installation to ensure a good bond. For a loose lay application, the vinyl flooring can be unrolled over deteriorating concrete. The concrete floor should be clean and dry and larger damaged areas should be patched to provide a smooth substrate before installation. Over time the garage floor mat protector will conform to the subfloor, so the smoother the better.
SUBSCRIBE
CHOOSE THE NEWSLETTER
THAT’S RIGHT FOR YOU
Select the newsletter that best matches your interests.
We respect your privacy. You can unsubscribe at any time.
BECOME A RESELLER
Complete the form below, and a member of our team will contact you.
